Case Study

Murray Bridge Equine Village & Land Development

Location: Murray Bridge, South Australia

Year: 2006 – current

Brief Description

The Murray Bridge Racing Club is relocating to new facilities on an 800 ha site, which required rezoning and engineering. The site contains a new race track and proposes a Community Title Equine Village of 56 lots specifically designed for thoroughbred racehorse trainers. State of the art training facilities are planned including opportunities for industry training centres and an equine veterinarian hospital. The Masterplan proposes some 3,500 housing allotments, town centre, and schools with associated service infrastructure.

FYFE's Responsibility

  • Invovlement in rezoning of the land for special uses and provision of feasibility information for the development
  • Surveying
  • Civil engineering
  • Project management
  • Land Division management and administration. 
Back to Case Studies